Goldsborough Mill

Project Brief: The UK Hydro Ltd were looking to install an archimedes screw into an existing mill race to generate power to be exported to the National Grid as an investment.

Project Summary:

The existing mill race had to be repaired and dammed both up and down stream to allow a civil package of work to be undertaken to complete the bases upon which the archimedes screw and channels in which the associated fish/eel passes would eventually be installed.

The archimedes screw was then craned into position and commissioned by the main contractor. A grid connection was established to allow the power generated to be exported and the associated tariff be claimed by the Client.

Client:

UK Hydro Ltd

Location:

Goldsborough Mill, Goldsborough

Market Sector:

Green Energy

Teigh Role:

Employers Agent, Quantity Surveyor & CDM Co-ordinator

Project Value:

£190,000 (Civils Package) & £250,000 (Archimedes Screw Package)

Duration:

12 Weeks

Form of Contract:

JCT Design & Build 1998 Edition

Floor Area:

N/A

"Teigh + Co have been instrumental in all aspects of every single project undertaken by UHDL and UK Hydro Limited since both companies inception. They are involved from the earliest planning stages through to project procurement, construction on site and post completion back up. They have an unblemished record in providing sound cost advice at every stage of project as well as project management services to deliver an outstanding end product and have been an integral part in the success of both companies. I would not hesitate to engage them on any future projects or recommend them to others."

David Brown, Managing Director
United Healthcare Developments Limited and UK Hydro Limited

©2018 Teigh+Co.  |  All Rights Reserved  |  Privacy Policy  |  Legal Information

Designed by Designs Creative