The existing mill race had to be repaired and dammed both up and down stream to allow a civil package of work to be undertaken to complete the bases upon which the archimedes screw and channels in which the associated fish/eel passes would eventually be installed.
The archimedes screw was then craned into position and commissioned by the main contractor. A grid connection was established to allow the power generated to be exported and the associated tariff be claimed by the Client.
UK Hydro Ltd
Goldsborough Mill, Goldsborough
Green Energy
Employers Agent, Quantity Surveyor & CDM Co-ordinator
£190,000 (Civils Package) & £250,000 (Archimedes Screw Package)
12 Weeks
JCT Design & Build 1998 Edition
N/A